May 29th Site Visit…

They are moving right along with the conduit installation and are ready to pour the concrete pads for the switchgear.

HVAC units for the electrical room, along with chiller pipes.  The pipes are now insulated.

How do you install 10,000 square feet of ceiling grid in about four hours?  Lots of guys wearing stilts.  And [...]

May 19th Site Visit…

Conduit running into electrical room

More conduit

Chiller pipes

Ductwork

Concrete pads for the generators

May 11th Pictures…

Chiller pipes are being welded, and four foot diameter ductwork hung from the ceiling

Trenching and conduit for generator power

NOC offices

May 6th…

Transformer

Concrete piers for chillers

On the left is the conduit for the switchgear, and then a picture of the general activity.   Those round tubes are the main ductwork for the HVAC.

Today’s Visit…

2000 square foot colo room

Concrete Cutting

Foundation for chiller units

Completed trenching for chiller pipes

Future concrete pads for the switchgear in the power room, and a birds eye view of the chiller pipe trench.