June 25th, Site Visit…

At this point, most of the equipment is in place and I don’t think we are in for any big changes in how things look:
Server cabinets are on the floor and power is being run.

In the transport area you can see the fiber being spliced.

We are really getting there…

June 17th, Site Visit…

Lots happening now that all the equipment has arrived:
Pulling wire from the transformer into the electrical room.

Load banks for testing the generators.

Wiring up the generators.

CRAH units.

Some video of the work in the electrical room.  Pulling wires and removing breakers for testing.

June 12th, Site Visit…

The switchgear has arrived a week early and everyone is relieved it’s here…

Talk about a tight fit!

June 5th Site Visit…

We are picking up speed this week as the large equipment arrives…
Generators

Chillers

UPS and battery cabinets

Maintenance bypass switchgear and PDU’s

One of the NOC offices and some RPP’s

Late next week they will begin installing the floor tiles in the data center.  When that is complete I believe we will see some dramatic [...]

June 3rd Site Visit…

The cabinets have arrived and are temporarily staged on the north side of the building.

The chiller pipes are now insulated and the loop is complete.

The ceiling grid is about 75% installed.  Overhead lighting as well…

Tomorrow the chillers and UPS’s arrive, and the follwoing day the generators will be delivered.