May 29th Site Visit…

They are moving right along with the conduit installation and are ready to pour the concrete pads for the switchgear.

Conduit Switchgear

HVAC units for the electrical room, along with chiller pipes.  The pipes are now insulated.

HVAC in Electrical Room Chiller Pipes

How do you install 10,000 square feet of ceiling grid in about four hours?  Lots of guys wearing stilts.  And let me just say that these guys are amazing.  They literally jump up onto the stilts and then buckle them on.  I wouldn’t want to fall…

Ceiling Grid Ceiling Grid

The CRAH units have been delivered and are awaiting installation.

CRAH Units CRAH Units