June 17th, Site Visit…

Lots happening now that all the equipment has arrived:

Pulling wire from the transformer into the electrical room.

Transformer Electrical Room

Load banks for testing the generators.

Load Bank Load Bank

Wiring up the generators.

Generator Generator

CRAH units.

CRAH Units CRAH Units

Some video of the work in the electrical room.  Pulling wires and removing breakers for testing.